Cruising Indigo
  • Home
  • The Crew
    • Our Dream
    • Our Search
    • Our Why
  • The Boat
    • Why PS34?
    • Bill Crealock
    • PS34 Specs
    • Pacific Seacraft
  • Upgrades
    • Misc >
      • Computer Table
      • Cockpit Step
      • Mast Pulpits
      • Instrument Panel
      • Spice Rack
      • Shelving
      • Dinghy
      • Interior Lighting
      • Exterior Lighting
      • Yacht Transport
      • Ladder
    • Sails >
      • Roller Furling
      • Standing Rigging
    • Wind Vane
    • Batteries
    • Radar & Wind
    • Engine Mods >
      • Engine Panel
      • Fuel System
      • Fluid Capacity Gauge
    • Head
    • Solar Panels
    • Watermaker
    • To Do List
  • Pics
  • Links
  • Blog

yardbird

9/22/2014

Comments

 
PictureIndigo and her nice new bottom.
Definition of a yardbird as found in Urban dictionary (one of several): "A generally useless person, who works at a shipyard. Known for stealing various tools and working very slowly. The scruffy facial hair and hardhat is a dead giveaway."

While in the yard these past 12 days I was generally useless, worked slowly, consulted my iphone on a regular basis, got distracted by shiny objects and humongous spiders, didn't know a crescent wrench from a vice grips, and I even lost Brian's favorite screwdriver he'd had since he was like 2 (so he says). Thankfully, I did not grow scruffy facial hair, but I would (and I'm sure Brian concurs) now call myself a yardbird. Brian on the other hand was highly productive, despite working outside 9 hours a day in record high temps in San Diego.

We hauled the boat on Wednesday Sept 10. Our main goals were to raise the water line, bottom paint, install wind indicator, redo the standing rigging, spot paint the mast and replace chain plates, as well as some other minor items like greasing/painting the prop, welding a spinnaker loop to the masthead and lots of stainless steel polishing… a tall order for one week. We did it, albeit in 12 days as opposed to 8, but who’s counting.

We paid the Oceanside Marine Center to raise the water line. Indigo is now so heavily laden with “stuff” that water is lapping well above the bottom paint, causing green growth and critters to cling onto the red topside paint. We sadly watched as they sanded over our beautiful red boot stripe leaving only about an inch amidships. We had debated whether to remove the red line altogether to allow more leeway. But vanity outweighed logic…we just could not envision the boat without a stripe, and we didn’t want to pay the extra money to paint an entirely new boot stripe. Even worse, we would never have matched the top automotive paint red hue. We may regret this decision eventually.

The chain plates and the rigging attached to those plates hold the mast up, so we’d rather keep it that way. While we purchased all new chain plates we decided for time sake, to only replace the 3 main plates instead of all 7.  I assumed we’d be in for a huge mess with chipped paint and/or cracked wood as a result of trying to pry 20-yr old plates from the hull, but remarkably, this was not the case. However, after we removed the backstay, we determined the 4 holes in the new plate did not line up with the old ones. By about ¼”. Whhaattt??! No way on earth we are drilling new holes into the outside of the boat. So we polished it up to look like new (fortunately no cracking or corrosion) and re-bedded the old one.  We did remove & replace the 2 uppers which take the brunt of the load. While all the holes lined up this time, the new plates were about 1/8” too wide. Brian had to file down the inside of the wood rubrail so the plates could slide through. Nothing is ever simple.

Next was to replace the 20-yr old standing rigging. Brian purchased all the components from riggingonly.com and did all the Sta-Lok fittings himself, saving probably 1/2 to 3/4 the cost of a rigging contractor.  It took 2 full days to lay all the rigging out, cut and splice the fittings together for 7 stays (jib & staysail were already done with the roller furling 2 years ago). Brian up-sized the line to 9/32” for more strength. The most difficult part was in tightening the fitting. The edges of the strands must be spaced out evenly and can get pushed down if tightened too hard, resulting in an unsafe joint. While there was a learning curve, Brian got the tension down pat and we fortunately only had to recut one long stay. This was probably the most nerve-wracking project Brian has done thus far but he is glad to have gone through the difficult process.

Other items on the plate pertained to the mast. We ran the wind indicator wire; got a loop welded to the front of the top of the mast for the light air sail block; installed a mast track for the storm sail; polished lots of stainless steel parts; and painted portions of the mast that had corroded. This was the most time-consuming of the projects and required us to re-launch the boat mastless while we continued to work on the mast in the yard with Indigo lonely back in her slip.

Painting took more days than we thought and we were stymied at every turn. After grinding away the corroded areas we had to do 4 primer coats to cover the now bare aluminum. Then we got the wrong cream paint color and had to drive all the way to San Diego to get a $100 quart, yes I said quart, of the right color (and only needed about 4 ounces). Then we were delayed due to potential rain. The last day after sanding and taping and painting the 8th time we put on the final coat. It was like that final coat was a magnet for chaos: Twice as many people seemed to drive into the yard that day kicking up constant dust. I had to ask one employee not to park next to the mast who thus gave me the stinkeye. Then another guy bent down to help Brian pick up something and was a pencil thickness way from touching his hair to the paint before Brian pushed his head away just before he caused a gooey mess. I, in turn, averted a customer who sauntered over to inspect our work and reached out to touch the mast while asking “Hey is this wet?”. I literally slapped his hand away before he accidentally started fingerpainting. Seriously? So while it didn’t turn out perfect, it’s a good enough 10ft paint job and most importantly, WE ARE DONE.

Now to tune the rigging (properly tension everything), put all the sails and lines (ropes) back on and then off to Mission Bay and hopefully our first overnight sail. 5 weeks to go!



Comments

    RSS Feed

    Archives

    March 2018
    December 2017
    November 2017
    October 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    December 2013
    November 2013
    October 2013

    Categories

    All
    Agua Verde
    Air Conditioning
    All-inclusive Resort
    Anchoring
    Bahia Amortajada
    Bahia Cardonal
    Bahia Cobre
    Bahia Concepcion
    Bahia Salinas
    Baja Ha Ha
    Baja Ha-Ha
    Balandra Beach
    Ballandra Bay
    Balloonfish
    Baluarte Bridge
    Bashing
    Boat Refrigeration
    Boatwork
    Boatyard Fatigue Syndrome
    Bottom Paint
    Bullfight
    Campervan
    Cancun
    Candeleros Bay
    Canvas
    Carlsbad Caverns
    Carnaval
    Chainplates
    Charleston
    Chichen Itza
    Cliff-Divers
    Cockpit Table
    Containers
    Cortez Angelfish
    Crossing
    Cruising Friendships
    Culture
    Cutlass Bearing
    Destination Wedding
    Dinghy
    Dodger
    Dolphins
    Driving In Mexico
    Dry Storage
    Durango
    EcoBaja Tours
    El Burro Cove
    Ensenada Grande
    Fireworks
    Fish
    Flat Tire
    Food
    Fun Baja
    Georgia
    Grandpa
    Gray Whales
    Guaymas
    Gulf Of California
    Haulout
    Hermosillo
    Hoffmaster State Park
    Holiday-inn-express
    Honeymoon-cove
    House
    Hurricane Blanca
    Hurricanes
    Interlochen
    Isla Carmen
    Isla Coronado
    Isla Danzante
    Isla El Coyote
    Isla Ispiritu Santos
    Isla San Francisco
    Isla San Jose
    Jumping Mobular Rays
    Kilometer 21
    La Paz
    Leelanau
    Life Raft
    List
    Llantera
    Loreto
    Los Gatos
    Los Islotes
    Los Osuna
    Marina Costa Baja
    Marina El Cid
    Marina Palmira
    Marina Seca
    Mayan
    Mazatlan
    Mexican Food
    Mexican Health Care
    Mexico
    Michigan
    Mobular Rays
    Mountains
    Mouse Aboard
    Moving Onto A Boat
    Mystical River
    New Orleans
    Nogales Border Crossing
    Nopolo
    Octopus
    Okefenokee Swamp
    Onilikan
    Pancho Villa Museum
    Pensacola
    Pima Air & Space Museum
    Playa Algodones
    Playa Bonanza
    Playa Coyote
    Playa Santa Barbara
    Playa Santispac
    Playa Santo Domingo
    Posada Concepcion
    Puerto Escondido
    Puerto Lopez Mateo
    Punta Chivato
    Punta Mangles
    Punta Perico
    Punta Pulpito
    Punta Salinas
    Radar
    Renaissance Festival
    Retinal Tear
    Retirement
    Rigging
    RV
    Safety
    Sailing
    Sailing Mexico
    San Carlos
    San Evaristo
    San Jose Channel
    San Juanico
    San Marte
    Sapphire NOW
    Savannah
    Sea Fireflies
    Sea Frost
    Sea Lions
    Sea Of Cortez
    Sea Turtles
    Serenbe Playhouse
    Shells
    Sleeping Bear Dunes
    Sleepy Hollow
    Snorkeling
    Stainless Steel
    St. Augustine
    Stingrays
    Storage
    Tacking
    Teak
    Tennessee
    Tequila Factory
    Texas
    Timbabiche
    TransUnion
    Tucson
    Tufesa Bus
    Tulum
    Underground River Swim
    Varnish
    Waterfalls
    Watermaker
    Whale Shark
    Wilderness State Park
    Wind Generator
    Windows
    Windvane
    Wing-on-Wing
    Winnebago Travato
    Woodworking

Powered by Create your own unique website with customizable templates.